Agents Builders

Release History Pagination

Archived
release-history-pagination

Created

Jun 29, 16:30

Started

Jun 29, 16:32

Completed

Jun 29, 20:09

DevOps handoff

Type

Feature

Shape

ui+db

Worktree Slug

release-history-pagination

Repositories

mcritchie-studio

Release Slug

Branch

feat/release-history-pagination

QA URL

Production URL

analytics release-history data-integrity

Acceptance Criteria

  • All deployments paginates twenty five releases
  • Release event timestamps explain missing starts
  • Release detail preserves completed event times

Expected Test Plan

  • [unit] release event metrics preserve timestamps
  • [component] release history and detail render timestamps
  • [integration] deployments history paginates correctly
  • [e2e] deployment history pagination remains navigable

Checks Run

  • [unit] mise exec ruby@3.3.11 -- bin/rails test test/models/release/duration_cache_test.rb test/models/release/conductor_test.rb
  • [component] mise exec ruby@3.3.11 -- bin/rails test test/controllers/releases_controller_test.rb
  • [integration] mise exec ruby@3.3.11 -- bin/rails test test/lib/release_cli_test.rb test/controllers/releases_controller_test.rb
  • [e2e] mise exec ruby@3.3.11 -- env E2E_PORT=3013 npx playwright test e2e/release_duration_dashboard.spec.js
  • [full-suite@dbc7476ce7784ab97d9b11cdafafd9e702809590] bin/rails test green
  • [rubocop@dbc7476ce7784ab97d9b11cdafafd9e702809590] bin/rubocop clean

Agent Context

Add 25-per-page pagination to /deployments/all to reduce load time. Investigate why the newest release detail shows missing release-event start timestamps for rows such as QA smoke, production smoke, release notes, and ship authorized; fix the deterministic cache/rendering if completed-only release events should expose useful timestamps.

Stage Timeline

Who handled each stage, the time it took (measured), and the model / tokens / cost reported (best-effort) — plus who's on it right now. means the agent didn't report that metric.

Sizing Avi · PO Dev SMALL Actual XL
  1. Created Designed
    V Victreebel
    Victreebel
    Model
    Duration
    Tokens
    Cost
    Completed Jun 29, 16:30 · 9 days ago
    api
  2. Designed Building
    V Victreebel
    Victreebel
    Model
    gpt-5.5
    Duration
    2 minutes
    Tokens
    743,150
    Cost
    ~$0.57
    Started Jun 29, 16:30
    Completed Jun 29, 16:32 · 9 days ago
    cli
  3. Building Submitted
    V Victreebel
    Victreebel
    Model
    gpt-5.5
    Duration
    24 minutes
    Tokens
    9,378,478
    Cost
    ~$6.94
    Started Jun 29, 16:32
    Completed Jun 29, 16:56 · 9 days ago
    cli
  4. Submitted Reviewed Review Activity
    S Shannon
    Shannon primary
    C Carl
    Carl light
    Model
    gpt-5.5
    Duration
    11 minutes
    Tokens
    1,450,390
    Cost
    ~$1.18
    Started Jun 29, 16:56
    Completed Jun 29, 17:07 · 9 days ago
    cli
  5. Reviewed Assembled
    S Steffon
    Steffon
    Model
    gpt-5.5
    Duration
    about 3 hours
    Tokens
    34,735,802
    Cost
    ~$25.99
    Started Jun 29, 17:07
    Completed Jun 29, 19:41 · 9 days ago
  6. Assembled Shipped
    A Avi
    Avi
    Model
    gpt-5.5
    Duration
    28 minutes
    Tokens
    9,163,074
    Cost
    ~$6.23
    Started Jun 29, 19:41
    Completed Jun 29, 20:09 · 9 days ago
  7. Shipped Archived
    Model
    Duration
    4 days
    Tokens
    Cost
    Started Jun 29, 20:09
    Completed Jul 04, 03:23 · 4 days ago

Conversation

QA review feedback, agent handoffs, and follow-up notes for this task.

Comment carl 9 days ago

Scout report: merge-ready - Light review found no blockers; acceptance coverage, DoR, CI, and targeted local Rails checks are green. Reporter: carl Outcome: merge-ready Findings: - Pagination limits /deployments/all to 25 releases with previous/next controls, and completed-only release events now render as zero-second spans preserving timestamps. - Merge safety is clean for PR #288; same-file overlap is limited to docs with other open release-base PRs, so no code overwrite risk found. Questions: - none Checks: - DoR-to-Merge passed in the feature worktree for shape ui+db. - GitHub CI scan_ruby, scan_js, lint, and test are green; PR is mergeable and CLEAN against release. - Local targeted Rails check passed: 86 runs, 347 assertions, 0 failures across duration cache, conductor, and releases controller tests. - Reviewed task metadata, PR body, diff, changed docs, tests, open PR overlap, and local /deployments/all HTTP 200.

Comment shannon 9 days ago

Scout report: merge-ready - Primary review found no blockers; acceptance, pagination, timestamp preservation, CI, DoR, and merge safety verified. Reporter: shannon Outcome: merge-ready Findings: - Blockers: none. - Non-blocker: PRs #286 and #282 overlap only docs touched here; release code paths are isolated. - Questions: none. Questions: - none Checks: - GitHub CI passed scan_ruby, scan_js, lint, and test on PR #288. - Local review ran targeted Rails tests: 173 runs, 723 assertions, 0 failures. - Local review ran focused Playwright pagination/detail spec on port 3097: 1 passed. - bin/dor-check release-history-pagination reports DoR-to-Merge met.

Handoff avi 9 days ago

Avi Heartbeat moved release-history-pagination to reviewed after shannon + carl reported merge-ready. Left for Steffon QA. Reports: - shannon: merge-ready - Primary review found no blockers; acceptance, pagination, timestamp preservation, CI, DoR, and merge safety verified. - carl: merge-ready - Light review found no blockers; acceptance coverage, DoR, CI, and targeted local Rails checks are green.

Sealed-bid sizing

Edit →

Alex (PM)

Avi (PO)

Dev

SMALL

Actual

XL