Agents Builders

Polish heartbeat span table

Archived
polish-heartbeat-span-table

Created

Jul 01, 06:31

Started

Jul 01, 06:32

Completed

Jul 01, 12:12

DevOps handoff

Type

Feature

Shape

ui+db

Worktree Slug

polish-heartbeat-span-table

Repositories

mcritchie-studio

Release Slug

Branch

feat/polish-heartbeat-span-table

QA URL

Production URL

ui

Acceptance Criteria

  • Event rows show resolved outcome and open state
  • Rows show Pokemon, model, tokens, cost aggregates
  • View full command input and output detail
  • Alex and McRitchie can grade each span

Expected Test Plan

  • unit
  • integration

Checks Run

  • [unit] heartbeat_helper: tokens_pair, event_totals aggregation, dominant model/mascot, open-vs-done span status badge
  • [component] event_table rolls up Pokemon/model/tokens/cost + status badge + span grade cell; event_drawer renders Alex+McR span editors posting to E2; grade markers server-render
  • [integration] alex_heartbeat: rolled-up columns, span-grade drawer GET, span-grade round-trip persists + renders marker; feedback: action drawer shows FULL input+output
  • [e2e] alex_heartbeat + heartbeat_feedback: 9 specs green — rolled-up columns, open/done status, span grade from drawer (live marker + reload), full-command input
  • [full-suite@56d385651143a9a9ded4b593f64fd6d9cc09d4a8] bin/rails test green
  • [rubocop@56d385651143a9a9ded4b593f64fd6d9cc09d4a8] bin/rubocop clean

Agent Context

Final piece of the narrated-events next-draft epic — the heartbeat UI (/alex/heartbeat, HeartbeatController#show, app/views/heartbeat/*). Release now has the backend: E1 resolves span outcomes + stamps atomic_actions.model + closes hanging spans; E2 added event grading. Addresses the operator's screenshot feedback on the current span table: (1) RENDER the outcome on each event row (category · reason → OUTCOME) and show an OPEN/in-progress span DISTINCTLY (badge) vs a closed one — outcomes now resolve so the '—' should fill in; the 'strange hanging event after PR submitted' now auto-closes via E1 but an open span should still read as in-progress, not a bug. (2) Add columns to EVENT rows: Pokemon (mascot), Model, Tokens, Cost — AGGREGATE from the rolled-up actions in @event_rows (sum tokens_in/out and cost across the span's actions; show the span's model via the actions' model / heartbeat_model_short). pokemon_lookup already exists; extend it to cover event mascots. Do the aggregation in the controller #show or a helper (heartbeat_helper.rb), not inline N+1. (3) FULL-COMMAND VIEW: a way to see the full tool input AND output for an action (currently truncated) — extend the existing drawer (_drawer, #feedback action) or an expand. (4) GRADE THE SPANS: add a grading editor (good/not RADIO + ~5-word slug + long-form + bank/discard) for BOTH Alex and McRitchie, POSTing to E2's endpoint: POST /alex/heartbeat/events/:id/grade (named heartbeat_event_grade), which returns JSON {id, atomic_action_id, atomic_event_id, grader, disposition, slug, long_form, banked, discarded}. Mirror the existing per-action _grade_editor / drawer UX; you may add a feedback_event GET drawer action. Keep the existing per-action grading path working. Mind the Alpine/Nokogiri test gotchas (feedback_board_alpine_integration_test_gotchas): x-data double-quotes, template x-if single-root, integration tests can't read Alpine-conditional DOM. Fresh worktree needs bin/rails tailwindcss:build before layout tests. Tests: integration for the grade-an-event flow (POST + persistence) and the column/outcome rendering; system-tier if feasible.

Stage Timeline

Who handled each stage, the time it took (measured), and the model / tokens / cost reported (best-effort) — plus who's on it right now. means the agent didn't report that metric.

Sizing Avi · PO MEDIUM Dev MEDIUM Actual LARGE ≠ forecast
  1. Created Designed
    C Caterpie
    Caterpie
    Model
    Duration
    Tokens
    Cost
    Completed Jul 01, 06:31 · 7 days ago
    api
  2. Designed Building
    C Caterpie
    Caterpie
    Model
    claude-opus-4-8
    Duration
    1 minute
    Tokens
    1,118,911
    Cost
    ~$0.91
    Started Jul 01, 06:31
    Completed Jul 01, 06:32 · 7 days ago
    cli
  3. Building Submitted
    C Caterpie
    Caterpie
    Model
    claude-opus-4-8
    Duration
    30 minutes
    Tokens
    650,675
    Cost
    ~$0.62
    Started Jul 01, 06:32
    Completed Jul 01, 07:02 · 7 days ago
    cli
  4. Submitted Reviewed Review Activity
    C Carl
    Carl primary
    S Shannon
    Shannon light
    Model
    claude-opus-4-8
    Duration
    about 1 hour
    Tokens
    536,023
    Cost
    ~$0.41
    Started Jul 01, 07:02
    Completed Jul 01, 08:18 · 7 days ago
    cli
  5. Reviewed Assembled
    3
    3618cc6d-6176-43d6-8cc0-45b6ffcfffaa
    Model
    claude-opus-4-8
    Duration
    about 4 hours
    Tokens
    305,731
    Cost
    ~$0.21
    Started Jul 01, 08:18
    Completed Jul 01, 11:53 · 7 days ago
    cli
  6. Assembled Shipped
    3
    3618cc6d-6176-43d6-8cc0-45b6ffcfffaa
    Model
    claude-opus-4-8
    Duration
    19 minutes
    Tokens
    7,887,095
    Cost
    ~$5.75
    Started Jul 01, 11:53
    Completed Jul 01, 12:12 · 7 days ago
    cli
  7. Shipped Archived
    Model
    Duration
    3 days
    Tokens
    Cost
    Started Jul 01, 12:12
    Completed Jul 04, 03:23 · 4 days ago

Conversation

QA review feedback, agent handoffs, and follow-up notes for this task.

No task feedback has been recorded yet.

Sealed-bid sizing

Edit →

Alex (PM)

Avi (PO)

MEDIUM

Dev

MEDIUM

Actual

LARGE